Renovations in the Arroyo Vista community began in spring 2007 and will continue throughout the 2009-10 school year. This will require some residents to relocate from one house to another during the year. Plans are still being finalized, and more information will be added to this page as it becomes available.

Click here for a map of Arroyo Vista and scheduled renovation phases.

The temporary quad is indicated in red on the map. Also refer to the Renovation Move Schedule chart below.

Overview

Arroyo Vista is currently undergoing a  two year renovation project.  This work is ongoing and is scheduled to be completed in the fall quarter of 2009.  Please review the Summary Overview (PDF) if you wish to learn more about what is taking place in the community regarding this project.

Background
Over the past several years, Arroyo Vista has experienced a number of maintenance problems caused by construction defects dating back to 1993. The AV Operations staff has worked diligently to stay on top of these issues until compre-hensive renovation plans could be developed. The AV renovation project was approved and began in April 2007. In order to keep Arroyo Vista open during renovations, a phased process is planned, spanning both the 2007-08 and 2008-09 academic years with renovations ending after Fall 2009. 

Phased Renovations and Temporary Moves
Each renovation phase will take roughly one quarter to complete, and a quad of four houses will be repaired during each phase. Residents from those houses will be required to relocate to a designated "temporary quad", consisting of houses 1064, 1066, 1068, and 1070. When repairs are completed, students will move back to their original location. Moves to and from the temporary quad occur during scheduled academic breaks between fall and winter, and winter and spring quarters.

Renovation Move Schedule (Please See Updates from the Director)
During the summer and 2009-10 academic year, the following houses are scheduled for renovation that will require those residents to move to and/or from the temporary quad in the time frames indicated:

Summer 2009
Houses
Move Out
Move back to House
IPACS - 1022 June 14 , 2009  September 20, 2009
Alpha Chi Omega - 1024
Kappa Kappa Gamma - 1026
Biology (Mixed) - 1028
Fall 2009
Houses - Move to
Move into Temporary Quad
Moves out of temp quad
CHP 1006 - 1068 September 20, 2009  June 15, 2010
CHP 1008 - 1064
CHP 1010 - 1066
CHP 1012 - 1070

 

The dates specified for moves allow for temporary quad houses to be cleaned before each new group of residents moves in. Residents who cannot move on the specifed dates will be required to put their belongings into temporary storage provided by Arroyo Vista before leaving campus for the break. When they return from break, they can move their belongings from temporary storage to their assigned living space.  Arroyo Vista will provide students with resources to facilitate the move process.

Other Possible Inconveniences During Renovation
Even if the house in which you plan to live is not scheduled for relocation during the school year, you could be impacted by increased noise and dust levels resulting from renovation activities. Click here for a map of Arroyo Vista and scheduled renovation phases. The temporary quad is indicated in red on the map.

 

Should you have any concerns or questions regarding these issues, do not hesitate to contact the Arroyo Vista Housing Office at
(949) 824-3900 or e-mail avoffice@uci.edu

 

For more information about UC Irvine Student Housing, please visit our website at www.housing.uci.edu